免费一级a毛片在线播放'视频正片,欧洲破处AV,妖精囯产A片,九九热视频这里只有精品,国产美女在线一区二区三区,国产18在线播放

Guangzhou Tabard Fire-Proof Materials Co. Ltd. / Guangzhou Tabard Special Coating Engineering Co. Ltd. 

W-400 High-temperature Resistant Anti-corrosive Coating (Primer/ Finish)
  • W-400 High-temperature Resistant Anti-corrosive Coating (Primer/ Finish)
  • Specifications
    • Product Name:W-400 High-temperature Resistant Anti-corrosive Coating (Primer/ Finish)
    • Product Number:W-400
    • 分享到:
  • Details
  • Product Description

    The product is consisted of organic silicon resin, special high temperature resistant corrosion resistant paint, additive, padding, auxiliaries, solvent, etc. They can be divided into primer and finishing coat, and also can resist high temperature for a long time, supporting excellent binding force, corrosion resistant, meanwhile resisting chemical atmosphere, climate ageing, water and have a good humidity resistant, good decorative function, electrical insulating property.


    Design Purpose 

    The product is used for the high temperature corrosion of blast furnace and the outer wall of hot blast stove, also can used for the requested protection of high temperature corrosion on the surface of chimney, flue, vent-pipe, high temperature heat pipe, heating furnace, heat exchanger and other metal.


    Physical Parameters

    Color:

    Primer: rust ,Finishing coat: white black etc

    Luster

    Semi-gloss

    Theoretical spreading rate

    Primer: 170g/m2, 10.58m2/L (calculated by 30μm dry, excluding loss)

    Finishing coat:100g/m2, 13.0m2/L (calculated by 25μm dry, excluding loss)

    Specific gravity:

    Primer: Approximate 1.80

    Finishing coat: Approximate 1.30

    Drying time

    Primer/ Finishing coat   :Surface dryness:1h , Solid dryness:24h

    Flash point

    Primer: 13℃, Finishing coat: 26℃

    Storage period

    Primer / Finishing coat: 12 months

    Construction Instruction

    Mixing ratio

    Single canned

    Maturing time

    Open and stir

    Service life

    Unlimit

    Construction method

    High pressure siphon spray, air spray, manual spray, roller spray

    Diluent

    X-21 high-temperature resistant coating diluent

    Maximal dilution amount

    High pressure siphon spray<5%,air spray<10%,  manual spray and roller spray shall not be diluted

    Spray orifice

    0.4~0.5mm for high-pressure siphon spray; 2.0~2.5mm for air spray

    Spray pressure

    12~15Mpa for high pressure siphon spray; 0.3~0.4Mpa for air spray

    Tool washing

    X-21 high-temperature resistant coating diluent

    Film coating thickness

    Primer: 90μm for wet film, 30μm for dry film

    Finishing coat:70μm for wet film,25μm for dry film

    Coating interval

    Primer

    Finishing coat

    Substrate temperature

    5℃

    20℃

    30℃

    Substrate temperature

    5℃

    20℃

    30℃

    The shortest

    24h

    16h

    8h

    The shortest

    48h

    24h

    16h

    The longest

    Unlimit

    The longest

    Unlimit

    Surface treatment

    *The new steel surface shall be conducted the treatment of Shot blasting or Sand blasting ,meeting the Swedish derusting standard Sa2.5 level ,roughness is 40~70μm;

    *The maintaining surface can be derusted by manual machine, meeting the Swedish derusting standard Sa3 level , roughness is 40μm.

    Construction condition

    The substrate temperature must over 3℃ than usual ,relative humidity primer must over 50%,the finishing coat must less than 85%.

    Finishing paint

    Epoxy resin coatings, Epoxy asphalt coating, Chlorinated rubber coating,Acrylic resin coating, Acrylic resin coating, Phenolic resin coating, Polyurethane coating, Chlorosulfonated polyethylene coating, High chlorinated polyethylene coating.

    Packing Specification

    Primer:20 liters containers can load 25kg components

    Finishing coat:20 liters containers can load 20kg components

    Safety guide

    Avoiding inhalation of vapor or mist, skin and eyes shall not be contacted with this product. In the process of construction, the forced ventilation shall be provided especially in the place which is in narrow and stagnant air condition. The protective gear shall be provided in the execution of construction.

    Annotation

    *Above-said thickness of dry film and wet film refers to the index while implementing the high-pressure air-free spray;

    *Relevant data in this instruction is obtained from laboratory, the actual product may be slightly different from it;

    *If above data is changed, the data is based on the latest instruction, without prior notification.

     

Tags: